coursework-banner

BUS 519 Week 9 Assignment 4 Project Progress

BUS 519 Week 9 Assignment 4 Project Progress

Note: The assignments are a series of papers that are basedon the same case.The assignments are dependent upon oneanother

During the project life cycle,project risk reviews and reports are required as previously identified in therisk management plan. Two months after the project started, the followingevents have taken place:

1. The top-two (2) threats haveoccurred.
2. The top opportunity has been realized.
3. The project’s risk budget is alreadyexhausted.
4. Therisk management schedule has been shortened by two (2) months.

Write a five to seven (5-7) pagesspaper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and explain why.
Determine if budget / schedule changes are necessary and explain why.
Update the risk register and highlight the changes made. Provide the justification for the changes.
Use at least four (4) quality resources in this assignment.
Note: Wikipedia and similarWebsites do not qualify as quality resources.

Your assignment must follow theseformatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.