coursework-banner

BUS 519 Project Risk Management Risk Workshop and Risk Register

BUS 519 Project Risk Management Risk Workshop and Risk Register

BUS 519 Project Risk Management Risk Workshop and Risk Register

Risk Workshop and Risk Register

Note: The assignments in this course are a series of papers that are based on the same case, which is located in the XanEdu tab in the left-hand menu of your course. The assignments depend on one another.

Write an 8–10 page paper in which you:

Identify the required pre-workshop activities.

Prepare a risk workshop agenda based on the Sample Agenda for a First Risk Assessment/Two-Day Risk Workshop (Figure B-8 in Practical Project Risk Management). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case.

Determine the top five threats in a risk register following the Sample Simplified Risk Register Format (Figure B-11 in Practical Project Risk Management). Include information from the case for each threat.

Justify the assignment of probability and impacts for each threat identified.

Document the top three opportunities in a risk register following the Sample Simplified Risk Register Format (Figure B-11 in Practical Project Risk Management). Include information from the case for each opportunity.

Justify the assignment of probability and impacts for each opportunity identified.

Use at least three quality resources in this assignment. Note: Wikipedia and similar websites do not qualify as quality resources.

This course requires the use of Strayer Writing Standards. For assistance and information, please refer to the Strayer Writing Standards link in the left-hand menu of your course. Check with your professor for any additional instructions.

The specific course learning outcome associated with this assignment is:

Create a risk register that assesses the probability of impacts for threats and opportunities and is informed by a risk workshop.

Click here to ORDER an A++ paper from our Verified MASTERS and DOCTORATE WRITERS: BUS 519 Project Risk Management Risk Workshop and Risk Register

ADDITIONAL INSTRUCTIONS FOR THE CLASS

Discussion Questions (DQ)

Initial responses to the DQ should address all components of the questions asked, include a minimum of one scholarly source, and be at least 250 words.

Successful responses are substantive (i.e., add something new to the discussion, engage others in the discussion, well-developed idea) and include at least one scholarly source.

One or two sentence responses, simple statements of agreement or “good post,” and responses that are off-topic will not count as substantive. Substantive responses should be at least 150 words.

I encourage you to incorporate the readings from the week (as applicable) into your responses.

Weekly Participation

Your initial responses to the mandatory DQ do not count toward participation and are graded separately.

In addition to the DQ responses, you must post at least one reply to peers (or me) on three separate days, for a total of three replies.

Participation posts do not require a scholarly source/citation (unless you cite someone else’s work).

Part of your weekly participation includes viewing the weekly announcement and attesting to watching it in the comments. These announcements are made to ensure you understand everything that is due during the week.

APA Format and Writing Quality

Familiarize yourself with APA format and practice using it correctly. It is used for most writing assignments for your degree. Visit the Writing Center in the Student Success Center, under the Resources tab in LoudCloud for APA paper templates, citation examples, tips, etc. Points will be deducted for poor use of APA format or absence of APA format (if required).

Cite all sources of information! When in doubt, cite the source. Paraphrasing also requires a citation.

I highly recommend using the APA Publication Manual, 6th edition.

Use of Direct Quotes

I discourage overutilization of direct quotes in DQs and assignments at the Masters’ level and deduct points accordingly.

As Masters’ level students, it is important that you be able to critically analyze and interpret information from journal articles and other resources. Simply restating someone else’s words does not demonstrate an understanding of the content or critical analysis of the content.

It is best to paraphrase content and cite your source.

LopesWrite Policy

For assignments that need to be submitted to LopesWrite, please be sure you have received your report and Similarity Index (SI) percentage BEFORE you do a “final submit” to me.

Once you have received your report, please review it. This report will show you grammatical, punctuation, and spelling errors that can easily be fixed. Take the extra few minutes to review instead of getting counted off for these mistakes.

Review your similarities. Did you forget to cite something? Did you not paraphrase well enough? Is your paper made up of someone else’s thoughts more than your own?

Visit the Writing Center in the Student Success Center, under the Resources tab in LoudCloud for tips on improving your paper and SI score.

Late Policy

The university’s policy on late assignments is 10% penalty PER DAY LATE. This also applies to late DQ replies.

Please communicate with me if you anticipate having to submit an assignment late. I am happy to be flexible, with advance notice. We may be able to work out an extension based on extenuating circumstances.

If you do not communicate with me before submitting an assignment late, the GCU late policy will be in effect.

I do not accept assignments that are two or more weeks late unless we have worked out an extension.

As per policy, no assignments are accepted after the last day of class. Any assignment submitted after midnight on the last day of class will not be accepted for grading.

Communication

Communication is so very important. There are multiple ways to communicate with me:

Questions to Instructor Forum: This is a great place to ask course content or assignment questions. If you have a question, there is a good chance one of your peers does as well. This is a public forum for the class.

Individual Forum: This is a private forum to ask me questions or send me messages. This will be checked at least once every 24 hours.

Check out Also: BUS 519 Project Risk Management Risk Management Plan